Electric Conduit Construction and its DBA Midwestern Contractors took on the project. After mobilization the existing wiring was removed and recycled. Some conduit and pull heads were replaced. Certain control boxes were replaced, and a customer termination box was installed.  It was a small job but a very important job to our customer. the short time we took to wire the pumps meant less down time and more product flowing through the pipeline.